Data Centers in Texas: Official List, Tax Breaks and Abatements

Texas has no official list of data centers with locations. The closest thing is the Comptroller's list of every facility registered for the state data center sales tax exemption: 67 qualifying data centers and 107 qualifying large data center projects. We add 10 local property tax abatement agreements and 16 state air permit records, which do give a city or county, for 200 official records in all.

Looking for a specific site's tax break? The incentives section below explains the two state exemptions, lists every data center abatement we found in the Comptroller's registry, and shows how to check a facility yourself.

Megawatt Index Editorial Team

Updated October 16, 2026Directory200 official records

Qualifying data centers
67
Tax Code 151.359
Large data center projects
107
Tax Code 151.3595
Local tax abatements
10
Chapter 312 registry
Records with a location
23
in 14 counties

Showing 200 of 200

Texas data center records
South Monahans DatacenterLarge data center project (151.3595)Sourcechecked 2026-10-16
SA01 DATA CENTERQualifying data center (151.359)Sourcechecked 2026-10-16
ROMANLarge data center project (151.3595)Sourcechecked 2026-10-16
Terisys ThompsonsQualifying data center (151.359)Sourcechecked 2026-10-16
Legacy Data Center SAT-1Qualifying data center (151.359)Sourcechecked 2026-10-16
Project RoyseQualifying data center (151.359)Sourcechecked 2026-10-16
Hutto Data Center 4 LLCLarge data center project (151.3595)Sourcechecked 2026-10-16
Leon CreekQualifying data center (151.359)Sourcechecked 2026-10-16
Project Dorothy 3AQualifying data center (151.359)Sourcechecked 2026-10-16
Project GoldeneyeLarge data center project (151.3595)Sourcechecked 2026-10-16
SDC Austin III LLC dba SDC Austin IV LLCQualifying data center (151.359)Sourcechecked 2026-10-16
Clocktower QuanahLarge data center project (151.3595)Sourcechecked 2026-10-16
Hicks Field Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
AUS 01 02 03 Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
Thelma Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
FlamingoLarge data center project (151.3595)Sourcechecked 2026-10-16
Pecos Ranch Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
Rise Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
Borden County Data Center Phase 2Large data center project (151.3595)Sourcechecked 2026-10-16
Scurry County Data Center BuildingLarge data center project (151.3595)Sourcechecked 2026-10-16
Scurry County Data Center Building 2Large data center project (151.3595)Sourcechecked 2026-10-16
Bexar 1Qualifying data center (151.359)Sourcechecked 2026-10-16
LBB01 Data CenterQualifying data center (151.359)Sourcechecked 2026-10-16
ECX AUS31-36Large data center project (151.3595)Sourcechecked 2026-10-16
Princeton ProjectCo LLCQualifying data center (151.359)Sourcechecked 2026-10-16
Walnut Springs ProjectCo LLCQualifying data center (151.359)Sourcechecked 2026-10-16
StingrayQualifying data center (151.359)Sourcechecked 2026-10-16
STN OD1 - Project LandmanLarge data center project (151.3595)Sourcechecked 2026-10-16
Milam County Data Center Phase 2Large data center project (151.3595)Sourcechecked 2026-10-16
Project LightningLarge data center project (151.3595)Sourcechecked 2026-10-16
Riot Rockdale Data Center 2Large data center project (151.3595)Sourcechecked 2026-10-16
Project StarQualifying data center (151.359)Sourcechecked 2026-10-16
Riot Corsicana Data Center 02Large data center project (151.3595)Sourcechecked 2026-10-16
Spectrum Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
Stampede Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
Gulf Horizon Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
Long Draw Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
Meitner Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
ECX AUS11-16Large data center project (151.3595)Sourcechecked 2026-10-16
Beacon Point 1 Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
Project WoodrowLarge data center project (151.3595)Sourcechecked 2026-10-16
C1 Bosque II LLCLarge data center project (151.3595)Sourcechecked 2026-10-16
C1 Bosque ILarge data center project (151.3595)Sourcechecked 2026-10-16
Freestone Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
Project WatertowerLarge data center project (151.3595)Sourcechecked 2026-10-16
Cedarvale, Barslow/Pyote TX Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
C1 Fort Worth LLCLarge data center project (151.3595)Sourcechecked 2026-10-16
Poolside Data Center, Pecos County IILarge data center project (151.3595)Sourcechecked 2026-10-16
DFW-04 Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
Lancium Clean Campus - Turkey 1Large data center project (151.3595)Sourcechecked 2026-10-16
Cipher Black Pearl LLC Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
Temple Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
Fluidstack Abernathy Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
EDC AUSTIN, LLCLarge data center project (151.3595)Sourcechecked 2026-10-16
EDC Fort Worth, LLCLarge data center project (151.3595)Sourcechecked 2026-10-16
Texas Enterprise Zone of Wilbarger CountyCounty tax abatementSourcechecked 2026-10-16
Texas Enterprise Zone of Wilbarger CountyCounty tax abatementSourcechecked 2026-10-16
Hackberry Data CenterQualifying data center (151.359)Sourcechecked 2026-10-16
CIPHER BABER LAKECounty tax abatementSourcechecked 2026-10-16
Riot Corsicana Data Center ILarge data center project (151.3595)Sourcechecked 2026-10-16
Milam County Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
Riot Rockdale Data Center 1Large data center project (151.3595)Sourcechecked 2026-10-16
Borden County Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
Cipher Barber Lake LLC Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
HEL02 DCLarge data center project (151.3595)Sourcechecked 2026-10-16
TX11-12 Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
TX21-22 Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
DFW02 LANCASTER (STACK)Large data center project (151.3595)Sourcechecked 2026-10-16
Poolside Data Center, Pecos County ILarge data center project (151.3595)Sourcechecked 2026-10-16
Red Oak Reinvestment Zone #9County tax abatementSourcechecked 2026-10-16
TX 301 Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
TX 302 Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
TX 303 Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
TX 304 Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
TX 305 Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
TX 306 Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
TX 307 Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
TX 308 Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
TX 309 Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
TX 310 Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
Riot RockdaleLarge data center project (151.3595)Sourcechecked 2026-10-16
DFW 9Qualifying data center (151.359)Sourcechecked 2026-10-16
DFW 10Qualifying data center (151.359)Sourcechecked 2026-10-16
DFW 11Qualifying data center (151.359)Sourcechecked 2026-10-16
DFW 12Qualifying data center (151.359)Sourcechecked 2026-10-16
Wurldwide LLC DBA Statue LLCLarge data center project (151.3595)Sourcechecked 2026-10-16
Cottonwood Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
Cinco Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
Fermi Data Center 1Large data center project (151.3595)Sourcechecked 2026-10-16
HorizonLarge data center project (151.3595)Sourcechecked 2026-10-16
Nexus Data CentersLarge data center project (151.3595)Sourcechecked 2026-10-16
Sweetwater IILarge data center project (151.3595)Sourcechecked 2026-10-16
EdgeConneX AU02Large data center project (151.3595)Sourcechecked 2026-10-16
Switch AUS 4Qualifying data center (151.359)Sourcechecked 2026-10-16
Project GoodnightLarge data center project (151.3595)Sourcechecked 2026-10-16
DFW 37Qualifying data center (151.359)Sourcechecked 2026-10-16
C1 Richardson LLC Data CenterQualifying data center (151.359)Sourcechecked 2026-10-16
Lancium Clean Campus - Childress 1Large data center project (151.3595)Sourcechecked 2026-10-16
Lancium Abilene Clean Campus IVLarge data center project (151.3595)Sourcechecked 2026-10-16
Lancium Abilene Clean Campus VLarge data center project (151.3595)Sourcechecked 2026-10-16
Lancium Abilene Clean Campus VILarge data center project (151.3595)Sourcechecked 2026-10-16
Lancium Abilene Clean Campus VIILarge data center project (151.3595)Sourcechecked 2026-10-16
Lancium Abilene Clean Campus VIIILarge data center project (151.3595)Sourcechecked 2026-10-16
Hutto Data Center 3 LLCLarge data center project (151.3595)Sourcechecked 2026-10-16
Hutto Data Center Campus LLCLarge data center project (151.3595)Sourcechecked 2026-10-16
PowerCampus Dallas by Lancaster Data Center Campus LPLarge data center project (151.3595)Sourcechecked 2026-10-16
Lancium Abilene Clean Campus IIILarge data center project (151.3595)Sourcechecked 2026-10-16
Austin Data Center 2 LLCQualifying data center (151.359)Sourcechecked 2026-10-16
Bull Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
C1 Dallas - Allen (LOT 1) LLCQualifying data center (151.359)Sourcechecked 2026-10-16
Cutten Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
Denton Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
Canadian Breaks Data CenterQualifying data center (151.359)Sourcechecked 2026-10-16
Independence Data CenterQualifying data center (151.359)Sourcechecked 2026-10-16
Hockley Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
Hockley Data CenterQualifying data center (151.359)Sourcechecked 2026-10-16
1242 McKinzie LLC Data CenterQualifying data center (151.359)Sourcechecked 2026-10-16
NTT Global Data Centers Americas - Dallas TX4Qualifying data center (151.359)Sourcechecked 2026-10-16
Giga Texas DatacenterLarge data center project (151.3595)Sourcechecked 2026-10-16
Microsoft Corporation (SAT 89-90)Large data center project (151.3595)Sourcechecked 2026-10-16
Giga Texas DatacenterQualifying data center (151.359)Sourcechecked 2026-10-16
Red Oak Texas Data Center 2Large data center project (151.3595)Sourcechecked 2026-10-16
SDC - Austin Tandem Data CenterQualifying data center (151.359)Sourcechecked 2026-10-16
SDC SATB1Qualifying data center (151.359)Sourcechecked 2026-10-16
TX11 Data CenterQualifying data center (151.359)Sourcechecked 2026-10-16
1102 McKinzie LLC Data CenterQualifying data center (151.359)Sourcechecked 2026-10-16
3301 Hibbetts Road Data CenterQualifying data center (151.359)Sourcechecked 2026-10-16
Cipher Black Pearl LLC Data CenterQualifying data center (151.359)Sourcechecked 2026-10-16
QTS Irving DC3 Data CenterQualifying data center (151.359)Sourcechecked 2026-10-16
QTS Irving 1Large data center project (151.3595)Sourcechecked 2026-10-16
Cedarvale, Barslow/Pyote TX Data CenterQualifying data center (151.359)Sourcechecked 2026-10-16
Fort Haskell Data CenterQualifying data center (151.359)Sourcechecked 2026-10-16
Bastrop Project OneQualifying data center (151.359)Sourcechecked 2026-10-16
Riot Corsicana Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
Dickens County Reinvestment Zone #1County tax abatementSourcechecked 2026-10-16
Microsoft Corporation (SAT 15-17)Large data center project (151.3595)Sourcechecked 2026-10-16
Dory Creek LLC Data CenterQualifying data center (151.359)Sourcechecked 2026-10-16
SDC DFW VIII, L.P.Qualifying data center (151.359)Sourcechecked 2026-10-16
Lincoln RackhouseLarge data center project (151.3595)Sourcechecked 2026-10-16
Cipher Mining Technologies Inc. - Odessa SiteQualifying data center (151.359)Sourcechecked 2026-10-16
Crusoe Data Center ProjectCounty tax abatementSourcechecked 2026-10-16
Alamo Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
NTT Global Data Centers Americas - Dallas TX2Qualifying data center (151.359)Sourcechecked 2026-10-16
NTT Global Data Centers Americas - Dallas TX3Qualifying data center (151.359)Sourcechecked 2026-10-16
Childress Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
Lancium Fort Stockton Clean CampusQualifying data center (151.359)Sourcechecked 2026-10-16
Pyote Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
Digital GarlandQualifying data center (151.359)Sourcechecked 2026-10-16
Lancium Abilene Clean CampusLarge data center project (151.3595)Sourcechecked 2026-10-16
Lancium Abilene Clean Campus IILarge data center project (151.3595)Sourcechecked 2026-10-16
West Texas Data CenterQualifying data center (151.359)Sourcechecked 2026-10-16
Lewisville DFW38Qualifying data center (151.359)Sourcechecked 2026-10-16
USBTC Pecos Data CenterQualifying data center (151.359)Sourcechecked 2026-10-16
Microsoft Corporation (SAT 80-85)Large data center project (151.3595)Sourcechecked 2026-10-16
Lonestar Taproot LLC - PyoteQualifying data center (151.359)Sourcechecked 2026-10-16
Lonestar Taproot LLC - TarbushQualifying data center (151.359)Sourcechecked 2026-10-16
Red Oak Texas Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
Polmer LLC Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
Stream DFW VII Data CenterQualifying data center (151.359)Sourcechecked 2026-10-16
Cyrusone LLC - Houston West III Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
Fort Blocks LLC Data CenterQualifying data center (151.359)Sourcechecked 2026-10-16
City of Abilene Reinvestment Zone No. RZ21-1County tax abatementSourcechecked 2026-10-16
City of Abilene Reinvestment Zone No. RZ21-1County tax abatementSourcechecked 2026-10-16
Microsoft San Antonio (SAT14)Qualifying data center (151.359)Sourcechecked 2026-10-16
Temple Green Data CenterQualifying data center (151.359)Sourcechecked 2026-10-16
HELO1 DCQualifying data center (151.359)Sourcechecked 2026-10-16
ALE60 Data CenterQualifying data center (151.359)Sourcechecked 2026-10-16
ALE61 Data CenterQualifying data center (151.359)Sourcechecked 2026-10-16
ALE62 Data CenterQualifying data center (151.359)Sourcechecked 2026-10-16
Rellis Campus Data and Research CenterQualifying data center (151.359)Sourcechecked 2026-10-16
Whinstone US Data CenterQualifying data center (151.359)Sourcechecked 2026-10-16
Sharka Data CenterLarge data center project (151.3595)Sourcechecked 2026-10-16
Midlothian Commercial-Industrial Tax Abatement Reinvestment Zone No. 14County tax abatementSourcechecked 2026-10-16
San Antonio Data Center IIIQualifying data center (151.359)Sourcechecked 2026-10-16
City of Allen Compass Datacenters Reinvestment Zone #33County tax abatementSourcechecked 2026-10-16
San Antonio Data Center IIQualifying data center (151.359)Sourcechecked 2026-10-16
Microsoft Corporation (SAT09 - SAT13)Large data center project (151.3595)Sourcechecked 2026-10-16
Winner LLC d/b/a Ernst LLCLarge data center project (151.3595)Sourcechecked 2026-10-16
State Farm Richardson Data CenterQualifying data center (151.359)Sourcechecked 2026-10-16
LinkedIn Richardson Texas Data CenterQualifying data center (151.359)Sourcechecked 2026-10-16
Microsoft CorporationQualifying data center (151.359)Sourcechecked 2026-10-16
NADCQualifying data center (151.359)Sourcechecked 2026-10-16
Lancium Abilene Clean Campus IXLarge data center project (151.3595)Sourcechecked 2026-10-16
Lancium Abilene Clean Campus XLarge data center project (151.3595)Sourcechecked 2026-10-16
ADC PlanoTCEQ air permitSourcechecked 2026-10-16
Longhorn Data CenterTCEQ air permitSourcechecked 2026-10-16
Goodnight Data CenterTCEQ air permitSourcechecked 2026-10-16
Fermi America Project Matador East CampusTCEQ air permitSourcechecked 2026-10-16
Nexus Data Center HubbardTCEQ air permitSourcechecked 2026-10-16
ABI-1 Electric Generating FacilityTCEQ air permitSourcechecked 2026-10-16
Westline 2335TCEQ air permitSourcechecked 2026-10-16
Roman Energy CenterTCEQ air permitSourcechecked 2026-10-16
Schlacter Data CenterTCEQ air permitSourcechecked 2026-10-16
SAT2 SAT3 SAT4TCEQ air permitSourcechecked 2026-10-16
QTS IrvingTCEQ air permitSourcechecked 2026-10-16
Red Oak DatacenterTCEQ air permitSourcechecked 2026-10-16
Vantage Data Center TX2TCEQ air permitSourcechecked 2026-10-16
Vantage Tx 11TCEQ air permitSourcechecked 2026-10-16
Sharka Data CenterTCEQ air permitSourcechecked 2026-10-16
Childress Data CenterTCEQ air permitSourcechecked 2026-10-16

Texas data center tax incentives

Texas data centers can get two kinds of tax break. The state exempts qualifying data centers from the 6.25 percent state sales and use tax on equipment and electricity; that is what the Comptroller's two lists record. Separately, a city or county can sign a Chapter 312 agreement that abates local property tax for a set period; the Comptroller keeps a registry of those agreements.

Texas state sales tax exemptions for data centers
ProgramMinimum investment and jobsLength
Tex. Tax Code 151.359State sales and use tax exemption for qualifying data centersAt least $200 million capital investment in the data center over a five-year period beginning on the certification date. At least 20 qualifying jobs in the county, not including jobs moved from another Texas county; qualifying job pays at least 120 percent of the county average weekly wage.10 years from certification for $200 million to less than $250 million invested; 15 years for $250 million or more
Tex. Tax Code 151.3595State sales and use tax exemption for qualifying large data center projectsAt least $500 million capital investment in the project over a five-year period (on or after May 1, 2015). At least 40 qualifying jobs in the county, not including jobs moved from another Texas county; qualifying job pays at least 120 percent of the county average weekly wage.20 years from certification

From the Texas Tax Code as checked on the Legislature's statutes site. The exemption covers the state tax only; local sales taxes still apply.

Data center property tax abatements (Chapter 312)

Chapter 312 tax abatement agreements for data centers in the Comptroller registry
OwnerWhereSignedRecord
Platon Investment LLCTexas Enterprise Zone of Wilbarger CountyWilbarger County2025-12-27Comptroller
Felix 1, LLCTexas Enterprise Zone of Wilbarger CountyWilbarger County2025-12-23Comptroller
CIPHER BARBER LAKE LLCCIPHER BABER LAKEMitchell County2025-12-15Comptroller
Alamo Mission LLCRed Oak Reinvestment Zone #9Red Oak, Ellis County2025-10-11Comptroller
Galaxy Power LLCDickens County Reinvestment Zone #1Dickens County2023-08-21Comptroller
Crusoe Energy System, LLCCrusoe Data Center ProjectWilbarger County2022-11-28Comptroller
Lancium Abilene LLCCity of Abilene Reinvestment Zone No. RZ21-1Abilene, Taylor County2021-12-21Comptroller
Lancium Abilene LLCCity of Abilene Reinvestment Zone No. RZ21-1Abilene, Taylor County2021-12-21Comptroller
Sharka LLCMidlothian Commercial-Industrial Tax Abatement Reinvestment Zone No. 14Midlothian, Ellis County2018-05-22Comptroller
Compass Datacenters DFW LLCCity of Allen Compass Datacenters Reinvestment Zone #33Allen, Collin County2016-11-15Comptroller

Agreements whose reinvestment zone or owner name refers to data centers, or whose reported industry code is data processing and hosting. An abatement under another name (a generic business park zone, for example) will not appear here.

How to check a specific facility

  1. Search the table above by company or city. Registrations are listed under the name the owner filed, which is often a project LLC or a building code (for example, DataBank's 4 registered sites appear as DFW 9, DFW 10, DFW 11, DFW 12, owned by DB Data Center Red Oak, LLC).
  2. For the state sales tax exemption, check the Comptroller's data center lists, which give the effective date and the owner, occupant and operator.
  3. For a local property tax abatement, search the Comptroller's tax abatement database by lead taxing unit (the city or county) or property owner name.
  4. If neither shows the facility, it may have an incentive under a general business program, or none. City council and county commissioners court agendas are the record of any local deal.

Counties with the most records

Texas counties by number of data center records with a location
#CountyRecords
1Ellis County3
2Taylor County3
3Wilbarger County3
4Bexar County2
5Collin County2
6Dallas County2
7Armstrong County1
8Carson County1

Only the 23 records that carry a location are counted; the Comptroller lists give none.

Coverage
All entries on the Comptroller's two registered lists, plus data center tax abatements from the Comptroller's Chapter 312 registry and data center air permit records from TCEQ. 23 records carry a city or county.
Sources
Texas Comptroller, data center lists, TCEQ
Last updated
, 200 official records

How this was built

The Comptroller's lists give each registered data center's name, owner, occupant, operator and effective date under Tax Code 151.359 (qualifying data centers) or 151.3595 (qualifying large data center projects). They give no location or size, because application details are confidential under the program. County tax abatement agreements (Chapter 312) and TCEQ air permit records add a city and county for some sites.

We did not match Comptroller entries to locations by company name, because one company can own several sites. For the exemption itself and other states' programs, see data center tax incentives by state.

Limits of this data

  • No official source we found reports megawatts for individual Texas data centers; ERCOT publishes large-load totals without naming projects.
  • Only facilities that registered for the exemption, signed a local abatement, or filed an air permit appear. Data centers that did none of those are missing.
  • The Comptroller lists include some facilities that appear to be cryptocurrency mining sites registered as data centers. We list them as published, without reclassifying them.
  • A name can appear on both Comptroller lists as separate registrations.

Sources

  1. 1.Texas Comptroller of Public Accounts, Data Centers in Texas: lists of all registered Qualifying Data Centers (Tax Code 151.359) and Qualifying Large Data Center Projects (Tax Code 151.3595)
  2. 2.Texas Comptroller, Chapter 312 tax abatement detail data (CSV) and per-agreement report pages
  3. 3.TCEQ, Summaries and Public Notices for Pending New Source Review Permit Applications (plain language summaries, notices processed before August 31, 2026)
  4. 4.TCEQ, Pending Applications: Title V Operating Permits (data updated 10/16/2026)
  5. 5.TCEQ, Statements of Basis for draft federal operating permits O4794, O4771, O4679 and notice of hearing for O4790
  6. 6.Texas Legislature, Tax Code chapter 151 (sections 151.359, 151.3595, 151.317)
  7. 7.ERCOT board and committee materials on large loads (checked for project-level MW; aggregate only, not used for rows)

Frequently asked questions

Do Texas data centers get tax breaks?

Yes. Qualifying data centers are exempt from the 6.25 percent state sales and use tax on equipment and electricity for 10 to 20 years, if they meet investment, jobs and size requirements (Tax Code 151.359 and 151.3595). Cities and counties can also abate local property tax under Chapter 312; the Comptroller's registry showed 10 data center agreements when we checked.

Does DataBank have a tax abatement in Plano or Richardson?

Not in the records we hold. The Comptroller's Chapter 312 registry, as checked October 16, 2026, lists no data center abatement for DataBank in Plano or Richardson, and DataBank's 4 registered sites in our data (DFW 9, DFW 10, DFW 11, DFW 12) are the Red Oak sites registered for the state sales tax exemption. A city abatement filed under a name that does not mention data centers would not appear here, so check the city council agendas for Plano and Richardson.

How many data centers are in Texas?

There is no official count. As of October 16, 2026, the Comptroller listed 67 qualifying data centers and 107 qualifying large data center projects registered for the sales tax exemption; facilities that never registered are not counted.